Search the courses, subjects, tracks, games and features, or jump straight to a page.
3 cards from this section. Quick, good the night before a test.
What is cycle time in bulldozer operations?
Think about the total time needed for bulldozer operations!
Name a component of fixed time in bulldozer operations.
What does the operator do that takes a constant amount of time?
What does fixed time in bulldozer operations primarily account for?
Think about what doesn't change with different haul distances.
True or False: Variable time is consistent regardless of conditions.
Consider how different conditions might affect task duration.
Design a productivity estimation for a bulldozer that works 45 minutes in an hour, with a haul distance of 30 meters, knowing it operates at 4 meters/second.
Break down the problem into calculating each time component.
Propose a method to analyze the effect of terrain changes on the bulldozer's overall productivity over a project.
Consider how changes in terrain will affect both speed and resistance!
5 more questions in this section. Enroll free to practise them all.
Enroll free