Search the courses, subjects, tracks, games and features, or jump straight to a page.
3 cards from this section. Quick, good the night before a test.
Define cycle time in bulldozer operations.
Consider what happens in each operational phase.
What is push time?
Think about the movement of the bulldozer.
What is the fixed time in the cycle time of a bulldozer?
Consider what part of the cycle time doesn't change.
True or False: Push time is variable and depends on haul distance.
Think about how distance relates to time.
If a bulldozer has a haul distance of 100 meters and operates at a speed of 4 m/s with a manual transmission maneuver time of 0.1 minutes, calculate the total cycle time.
Calculate push and backtrack times based on speed and distances.
Discuss the impact of transmission types on productivity when operating in a terrain with steep grades. Provide calculations showing differences between manual and automatic systems.
Consider how grade impacts speed and hence cycle times differently for each transmission type.
6 more questions in this section. Enroll free to practise them all.
Enroll free