Search the courses, subjects, tracks, games and features, or jump straight to a page.
2 cards from this section. Quick, good the night before a test.
Calculate the length of a vertical curve with a +2% and -1% grade and a rate of change of 1% per 30m.
Use the formula L = (g1 - g2) * 30 / r.
What is the reduced level (RL) if the chainage is 1000m and the height above datum is 50 m?
Simply state the height as the RL.
What is a vertical curve?
Consider the context of road design.
The formula to calculate the length of a vertical curve L = (g1 - g2) * 30 / r is used when calculating changes in:
Think about what the formula represents physically.
Design and calculate a vertical curve connecting a +3% grade to a -1% grade with a desired smooth transition over 150 meters. What will the chainage of each key point look like?
Consider how to break down the changes into smaller segments.
How would you approach calculating vertical curves on a multi-lane highway versus a single-lane road? Discuss factors you'd consider.
Think about vehicle dynamics and traffic flow.
4 more questions in this section. Enroll free to practise them all.
Enroll free