Search the courses, subjects, tracks, games and features, or jump straight to a page.
2 cards from this section. Quick, good the night before a test.
What does the acronym CBR stand for?
Think of the test's full name.
What is the purpose of the CBR Test?
Consider what this test evaluates regarding soil strength.
What does the CBR Test evaluate?
Think about the main function of the CBR Test.
True or False: A higher CBR value means a need for thicker pavement.
Consider the relationship between strength and thickness.
A construction project requires a pavement structure suitable for high traffic volumes. The subgrade has a CBR value of 5%. What recommendations can be made for the pavement design?
Consider what a low CBR value necessitates in terms of design.
You are given a project with various soil samples. Sample A has a CBR value of 10%, Sample B has 20%. How would the pavement specifications differ for each sample?
What is the direct relationship between CBR values and pavement design choices?
5 more questions in this section. Enroll free to practise them all.
Enroll free