Search the courses, subjects, tracks, games and features, or jump straight to a page.
2 cards from this section. Quick, good the night before a test.
What does CBR stand for?
Think about what this test measures.
What is the purpose of soaking a soil sample before the CBR test?
Recall the effect of water on soil strength.
What does the CBR test measure?
Focus on what kind of capacity it evaluates.
True or False: The soaking of soil samples may increase their strength.
Think about how water interacts with soil.
Analyze a CBR test result of a sandy soil which shows a CBR of 10%. Discuss the implications for road construction.
Consider the implications on structural needs based on traffic type.
Assuming a specific subgrade has a CBR value of 20%, calculate the required pavement thickness if a standard design suggests 300 mm for a CBR of 10%.
Think about structural requirements and how they change with CBR values.
5 more questions in this section. Enroll free to practise them all.
Enroll free