Search the courses, subjects, tracks, games and features, or jump straight to a page.
4 cards from this section. Quick, good the night before a test.
What does 'u' represent in crane operations?
Think about the pivot point of the crane.
What is the purpose of outriggers?
Consider what keeps the crane from tipping over.
What does the variable 'X' represent?
Focus on what the load line's position means.
Is it true that crane manufacturer ratings assume a level surface?
Think about operating conditions during crane lifting.
If a crane has a tipping load of 2000 kg, and you plan to use it on an uneven surface without outriggers, what adjustments to the lifting capacity should you consider?
Think about how stability is affected when operating conditions change.
Given the following parameters (P = 1.5m, f = 0.5m, u = 4m, W = 1600 kg, X = 12m), calculate L using the formula provided and state the implications for a crane's setup.
Double-check each distance against the formula.
7 more questions in this section. Enroll free to practise them all.
Enroll free