Search the courses, subjects, tracks, games and features, or jump straight to a page.
Learn it your way
A short class with Sarah and her students. The other ways are under More.
Sign up free to listen. Transcripts are free to read.
Today, we are going to learn about haul unit exchange time. Can anyone tell me why the positioning of trucks matters in excavation work?
I think it's to make loading easier and faster?
Exactly! The closer the truck is to the excavator, the more efficient the loading process. This reduces the haul unit exchange time, which is a key factor in productivity. Can anyone define what haul unit exchange time is?
It's the time it takes for a loaded truck to leave and for a new truck to arrive for loading?
Yes! This time directly impacts how quickly materials can be moved on-site. Remember, a reduced haul unit exchange time means less waiting and more productivity. Let's consider how a 90-degree angle between the truck and excavator can help.
Now that we understand haul unit exchange time, let’s talk about the angle of swing. What do you all think is the ideal angle for efficiency?
Is it 90 degrees?
Correct! The ideal angle of swing is 90 degrees. As the angle increases beyond this, the cycle time also increases leading to reduced productivity. Can anyone explain why that happens?
I think it's because the excavator has to move more, which takes more time.
That’s a good insight! The greater the angle of swing, the more time the excavator spends moving instead of loading. We must strive for that optimal setup! Let’s summarize these concepts—why is the 90-degree angle significant?
It provides the best productivity and reduces cycle times!
Now let's focus on the height of cut. Can someone describe how we can adjust for actual and optimal height?
We compare the actual height to the optimum height and calculate a percentage.
Exactly! If the actual height is lower than the optimum height, we must apply a correction factor. Can you recall how we determine what correction to apply?
By finding the percentage of actual height over optimum height?
Correct! This is crucial for accurately estimating productivity. Remember, less than 100% means we need to adjust downwards, impacting total output. Let's review how this contributes to overall project efficiency.
To estimate productivity effectively, we consider various factors, including heaped volume and the cycle time. What’s the formula for this?
We divide volume by cycle time, right?
You're on track! We multiply by cycles per hour too. Let’s not forget about incorporating the job efficiency coefficient when applying these figures. Why do you think this factor is important?
Because it reflects actual working time versus idle time!
Exactly! Applying these adjustments will ensure we get a realistic estimate of productivity. Remember, always apply the correction factors for height and angle when calculating!
Indicates the efficiency of material transfer and impacts productivity.
90-degree is the ideal swing angle for minimal cycle time.
Actual height compared to optimal height affects productivity and requires adjustment.
Used to refine productivity estimates when operational conditions differ from ideal scenarios.
The duration of one loading operation affects the overall production rate.
For haul time that's really prime, keep them trucks close, it's the right time!
Imagine a busy construction site where the trucks are all lined up. The excavator swings at 90 degrees, smoothly loading the trucks that are truly close. It’s quick, it’s slick, maximizing every tick!
H.A.P.P.Y.: Haul times are perfect at position yawning (90 degrees)!
H.E.A.T.: Haul Exchange And Time!
Term
What is an ideal angle of swing?
Click to flip
Term
What affects productivity in haul operations?
Click to flip
Term
How do you calculate the percentage optimum height?
Click to flip
The time required for a loaded truck to leave its position and for a new empty truck to arrive.
The horizontal angle between the loading position and the dumping position of the bucket.
The vertical distance of the cut being made from the surface.
A multiplier used to adjust productivity estimates based on deviation from ideal conditions.
The total time taken for one complete operation involving loading, swinging, and dumping.
The ratio of working time to total available time, expressed as a percentage.
This section discusses the importance of haul unit exchange time and its impact on productivity in excavation operations.
The section elaborates on the positioning of trucks relative to excavators to minimize haul unit exchange time, explaining how optimal positioning affects productivity. It also details how to estimate productivity, considering factors like height of cut and angle of swing.
In construction and excavation activities, the efficiency of operations largely hinges upon the haul unit exchange time, which is defined as the duration for a loaded truck to clear its loading position and for a new truck to take its place. The positioning of trucks close to excavators is preferred for better mobility and reduced cycle times. An optimal angle of swing of 90 degrees between the excavator and truck promotes ideal production rates. If parameters such as the actual height of cut and angle of swing deviate from ideal conditions, productivity must be adjusted through correction factors. This section also covers the importance of estimating productivity based on various operational parameters and concludes with a problem that applies these principles for practical understanding.