Search the courses, subjects, tracks, games and features, or jump straight to a page.
4 cards from this section. Quick, good the night before a test.
What is a correction factor in earthmoving?
Think about how real-world factors might change an ideal estimate.
Why does soil density matter in calculating productivity?
Consider how heavier materials influence work.
What is the purpose of correction factors in construction?
Think of real-world implications versus theoretical values.
True or False: A higher soil density generally increases productivity.
Consider physical effort required for denser materials.
A bulldozer can move 100 cubic meters of loose soil with ideal conditions. If the actual conditions require a correction factor of 0.7 for soil density, 0.9 for operator skill, and 0.85 for visibility, calculate the corrected productivity.
Multiply all the correction factors with the ideal productivity.
If the hourly cost of running a bulldozer is 1200 rupees, and the productivity in bank cubic meters is 30, what is the cost per bank cubic meter?
Divide the total cost by the productivity in bank cubic meters.
6 more questions in this section. Enroll free to practise them all.
Enroll free