Search the courses, subjects, tracks, games and features, or jump straight to a page.
2 cards from this section. Quick, good the night before a test.
What is a correction factor?
Think of it as a way to adjust your calculations.
How is job efficiency defined?
Consider the ideal time versus the actual time of operation.
What is the primary purpose of applying correction factors in productivity calculations?
Think about why projects may not meet ideal conditions.
True or False: An operator's skill level can impact the productivity calculation.
Consider if an inexperienced operator would perform at the same level as an experienced one.
A bulldozer is expected to operate on soil with a density of 1600 kg/m³, while the ideal curve is for 1365 kg/m³. Calculate the necessary correction factor and its impact on a productivity estimate of 80 loose cubic meters.
Always convert densities to see how they affect productivity.
If the budget for operating a machine is Rs. 1500 per hour and the estimated productivity is 60 bank meter cubes, what would be the new cost per bank meter cube if the hourly cost rises to Rs. 1800?
Reassess your budget and divide by the productivity to find costs.
5 more questions in this section. Enroll free to practise them all.
Enroll free