Search the courses, subjects, tracks, games and features, or jump straight to a page.
3 cards from this section. Quick, good the night before a test.
Define gravimetric capacity.
What does the manufacturer specify?
How is loading time calculated?
Think about the timing of loading activity.
What does gravimetric capacity refer to?
What does the manufacturer state about the machine?
True or False: It is safe to overload machines beyond their gravimetric capacity.
Consider the consequences of exceeding limits.
You are managing a project with a loader that has a cycle time of 1.5 minutes and a truck with a 35-minute cycle time. If the truck capacity is 12m³, how many trucks would be balanced?
Work with the cycle time ratios.
If the excavator can handle a dump of 15 tons, with a load of 8 tons per truck, how many truck loads can it process within a given time frame, assuming no waiting time?
Think about the limits versus machine capacity.
5 more questions in this section. Enroll free to practise them all.
Enroll free