Search the courses, subjects, tracks, games and features, or jump straight to a page.
4 cards from this section. Quick, good the night before a test.
Define cycle time in the context of a bulldozer's operation.
Think of all the tasks a bulldozer performs in one complete operation.
What is job efficiency?
Consider how long the bulldozer is operational compared to 60 minutes.
What components are included in the cycle time for a bulldozer?
Think of all the tasks a bulldozer performs in one complete operation.
True or False: Job efficiency is the same as cycle time.
Legitimate job efficiency does not take into account non-working time.
A bulldozer has a blade load capacity of 2.0 loose cubic meters and a cycle time of 2.5 minutes. How many loose cubic meters can it push in an hour if the job efficiency is 50%?
Keep in mind job efficiency affects overall output.
If the bulldozer works in a site with a higher material density that modifies productivity by 30% lower from a base of 100 loose cubic meters per hour, what is the adjusted productivity?
Think about how density affects bulldozer performance!
6 more questions in this section. Enroll free to practise them all.
Enroll free