Search the courses, subjects, tracks, games and features, or jump straight to a page.
2 cards from this section. Quick, good the night before a test.
What are the three components of cycle time for a bulldozer?
Think about what each time refers to in bulldozer operation.
Define job efficiency.
How long does the bulldozer work in an hour?
What is included in cycle time?
Think about what makes up the total time for an operation.
True or False: Maneuver time varies significantly depending on the dozing distance.
Consider what factors keep maneuver time consistent.
A bulldozer pushing material moves at a speed of 1 meter per second, with a push time of 20 seconds. Given a backtrack time of 10 seconds and a maneuver time of 5 seconds, calculate the total cycle time and potential productivity for 25 minutes of operation.
Break the problem into smaller steps for clarity.
Consider a case where a bulldozer operates on a slope and the cycle time increases by 20% due to terrain factors. If the original cycle time was 30 minutes, determine the new cycle time and discuss how that impacts productivity.
Calculate the impact in terms of cycles per hour to find the productivity change.
4 more questions in this section. Enroll free to practise them all.
Enroll free