Search the courses, subjects, tracks, games and features, or jump straight to a page.
5 cards from this section. Quick, good the night before a test.
What is cycle time?
Think about what operations a bulldozer performs.
Name one factor that affects maneuver time.
Consider how the bulldozer is controlled.
What does cycle time include?
Think about what happens in a full operation.
True or False: Correction factors are important only if performance curves are 100% accurate.
Consider how real-world scenarios differ from ideal conditions.
If a bulldozer’s ideal productivity, as per manufacturer's curve, is 500 m³/hour, and correction factors for operator skill (0.85) and visibility (0.9) must be applied, what is the actual productivity?
Multiply the ideal productivity by both correction factors sequentially.
A bulldozer with a total cycle time of 10 minutes operates at a job efficiency of 25 minutes per hour. How many cubic meters can it potentially move if the ideal production rate is set at 400 m³/hour?
Adjust the ideal production rate to reflect the hourly operation time.
5 more questions in this section. Enroll free to practise them all.
Enroll free