Search the courses, subjects, tracks, games and features, or jump straight to a page.
2 cards from this section. Quick, good the night before a test.
What is the formula for calculating cycle time?
Think about what each component stands for.
Can dump time be influenced by the type of material being handled?
Consider how easy it is to unload different types of soil.
What components are included in cycle time?
Remember the equation provided in the section.
True or False: Loading beyond 85% capacity can lead to increased productivity.
Think about how materials interact when too much is packed.
A construction site has scrapers with a cycle time of 4.5 minutes. If the project shifts to a new area that increases haul time by 30 seconds, what is the new cycle time?
Consider how each increment in time affects the overall cycle.
If a loader scrapes 100 tons in an hour but increases the payload by 100% without modifying the loading efficiency, what will be the effect on the loading time and the production rate?
Analyze the implications of load growth on the overall time.
4 more questions in this section. Enroll free to practise them all.
Enroll free