Search the courses, subjects, tracks, games and features, or jump straight to a page.
4 cards from this section. Quick, good the night before a test.
What does ADBT stand for in the cycle time equation?
Think about what happens when a vehicle speeds up or slows down.
What is the primary reason for maintaining haul routes?
Consider what factors might slow down a vehicle.
What defines the variable components of cycle time?
Think about how distance affects time taken.
True or False: Pushing scrapers to maximum load always increases efficiency.
Remember the loading growth curve discussed.
Analyze a loading curve where initially the load is increased but the loading rate decreases after reaching 85%. How would this affect operational costs?
Think about the efficiency each loading can provide.
A project manager reports that the haul route is poorly maintained. Calculate the potential impact on cycle time for a project with 10 scrapers working. Assume each scraper experiences a slowdown of 20%.
Quantify the impact based on a standard cycle time.
4 more questions in this section. Enroll free to practise them all.
Enroll free