Search the courses, subjects, tracks, games and features, or jump straight to a page.
3 cards from this section. Quick, good the night before a test.
What is the purpose of pitching the blade?
Think about how it affects the cutting angle.
Name one type of material that might require tilting the blade.
Consider types of challenging soils.
What movement allows for changing the cutting depth of the bulldozer?
Think about how the top of the blade moves.
Tilting of the blade is used to increase power concentration.
Visualize how pressure is distributed when tilting the blade.
Design a bulldozer plan using pitching, tilting, and angling while clearing a construction site with mixed soil types. What adjustments will you make based on the soil conditions?
Consider how each movement serves a different soil type.
Analyze a scenario where the incorrect use of blade movements (like not angling the blade in a tight area) leads to delays. What future strategies could prevent such mistakes?
Think about improving efficiency through operator awareness.
5 more questions in this section. Enroll free to practise them all.
Enroll free