Search the courses, subjects, tracks, games and features, or jump straight to a page.
2 cards from this section. Quick, good the night before a test.
What is the fill factor for a material that fills 90% of the bucket capacity?
Fill factors are expressed as a fraction of the total capacity.
Define static tipping load.
Consider safety and operational limits regarding tipping.
What is the bucket fill factor?
Think about how different materials may affect filling capacity.
True or False: The allowable operating load for wheel loaders is 50% of the static tipping load.
Consider safety guidelines mentioned in the section.
A loader with a static tipping load of 10,000 kg is operating. If a construction company plans to load the bucket with a heavy material weighing 2,000 kg/m³, what is the maximum volume of material they can load to ensure stability?
Use the tipping load and consider the weight per volume.
Calculate how many hours a loader can operate in a day if its productivity is 4,000 kg per hour and a project requires moving 20,000 kg of material.
Divide total material to move by hourly output for hours needed.
5 more questions in this section. Enroll free to practise them all.
Enroll free