Search the courses, subjects, tracks, games and features, or jump straight to a page.
3 cards from this section. Quick, good the night before a test.
What is back-track loading?
Think about the word backtrack!
Which method is best for narrow, long cuts?
Consider methods designed for efficiency!
What is back-track loading?
Think about why it might be slower than others.
Chain loading is best suited for what type of construction?
Consider efficiency in layout!
In a project using back-track loading, the loading time is 2 minutes per scraper, and two scrapers are needed. Calculate the total time taken if the pusher's return time is also 2 minutes. Discuss potential strategies to improve efficiency.
Focus on both loading and return times!
A construction manager wants to employ shuttle loading on a new site with scrapers moving in both directions. If each scraper costs $100/hour to run, calculate the expected savings in labor costs by reducing wait time by 50% using the shuttle method over ten hours compared to back-track.
Think about how time translates to cost!
6 more questions in this section. Enroll free to practise them all.
Enroll free