Search the courses, subjects, tracks, games and features, or jump straight to a page.
2 cards from this section. Quick, good the night before a test.
What is back-track loading?
Think about how the process flows.
Name one advantage of chain loading.
Consider the process speed.
Which loading method is considered the slowest?
Consider the need for return trips.
True or False: Chain loading involves the pusher returning to get the next scraper.
Think about movement efficiency.
A construction site uses back-track loading, with an average return time of 8 minutes and load time of 5 minutes. If they switch to chain loading, predict the potential time savings in completing a cycle.
Compare the total cycle times of both methods.
If a project requires 100 loads and the pusher cycles every 3 minutes, how many scrapers would ideally be needed to keep up with this pace without delays?
Break down the problem into required cycles and the time taken.
5 more questions in this section. Enroll free to practise them all.
Enroll free