Search the courses, subjects, tracks, games and features, or jump straight to a page.
4 cards from this section. Quick, good the night before a test.
What is the back-track loading method?
Think about how the pusher moves after loading.
Name one advantage of chain loading.
Does it have to go back like the back-track method?
What is the slowest loading method?
Think of how the pusher moves after loading.
True or False: Chain loading eliminates backtracking.
Consider how the pusher operates after loading the first scraper.
A construction site needs to calculate the productivity of scrapers operating under different loading methods. If scraper loading time remains constant at 4 minutes, analyze how the methods' cycle times affect overall production over an 8-hour shift.
Focus on understanding how each cycle time affects total time available.
Given the average pusher takes 3 minutes per cycle, calculate how many scrapers can be effectively managed by one pusher if the loading time is established at 6 minutes using the balancing formula N = Ts/Tp.
Substitute into the formula for a clear understanding.
6 more questions in this section. Enroll free to practise them all.
Enroll free