Search the courses, subjects, tracks, games and features, or jump straight to a page.
5 cards from this section. Quick, good the night before a test.
What does visual inspection involve?
Think about what you look for during inspection.
What is the purpose of the slump test?
Consider what happens to the concrete when it's left alone.
What is the purpose of visual inspection in fresh concrete?
Think about why we assess concrete once it is mixed.
True or False: Bleeding is when water rises to the surface of freshly placed concrete.
Recall the definition of bleeding in concrete.
A contractor fails to perform a visual inspection before pouring concrete. What potential issues might arise, and how would you address them?
Think about previous discussions on the signs of poor quality concrete.
Calculate the required number of samples if you are working on a project with an expected total volume of concrete of 50 m3.
Divide the total volume by the sampling rate.
4 more questions in this section. Enroll free to practise them all.
Enroll free