Search the courses, subjects, tracks, games and features, or jump straight to a page.
3 cards from this section. Quick, good the night before a test.
What is the main reason for timing the demoulding process?
Think about the consequences of removing an element too early.
List two types of finishes used for precast concrete surfaces.
Recall the different surface appearances we discussed.
Why is it important to wait before demoulding concrete?
Think about what could happen if it isn't strong enough.
True or False: A textured finish may improve grip for walking surfaces.
Recall the functions of different finishes.
Evaluate the pros and cons of using acid-etched finishes versus painted finishes for urban infrastructure elements. Which would you prefer and why?
Consider longevity and maintenance when weighing the two options.
Design a testing plan for determining the optimal demoulding time for a particular variety of concrete used in precast elements. What parameters would you measure?
Think about how you assess whether concrete is ready to demould.
5 more questions in this section. Enroll free to practise them all.
Enroll free