Search the courses, subjects, tracks, games and features, or jump straight to a page.
2 cards from this section. Quick, good the night before a test.
What is the slump test used for?
Think about the consistency of the mix.
What does record keeping in quality control involve?
Consider what information might be important for traceability.
What is the primary purpose of quality control in RMC?
Think about what quality control aims to achieve.
True or False: The time from batching to placement should be no more than 90 minutes.
Reflect on the guidelines set by the standards.
You are responsible for a concrete batch that fails the compressive strength test after 28 days. What steps would you take to analyze and rectify the issue?
Consider the entire process from batching to placement.
A construction site reports inconsistent workability of different batches delivered. Design a plan to investigate and improve consistency in future deliveries.
Think about all aspects from production to transport that could influence the outcome.
5 more questions in this section. Enroll free to practise them all.
Enroll free